Case Study
Strengthening Of Unreinforced Concrete Block Walls With Glass FRP
STRENGTHENING OF UNREINFORCED CONCRETE BLOCK WALLS WITH GLASS FRP Name: United Airlines Type: Airport Location: Oakland International Airport Completed: November 1997 Project Overview PROBLEM The United Airlines maintenance facility at the Oakland California International Airport is a URM building that can accommodate six large aircraft at any one time. The URM walls surrounding the stairway needed a seismic upgrade. Because