APPLICATION Stormwater Detention PROJECT LOCATION Kelowna, BC, CANADA PROJECT DETAILS Stormwater Detention for Sub Division Development PROJECT COMPLETION May 2006 Installation Volume: 437.9 m³ (15464 cf) water storage Installation Date: Start - April 24th 2006 Completion Date: May 5th 2006 The Atlantis tank system installation consisted of a 437m³ (15464 cf) detention tank installed within a sub division. The underground detention system receiv