Case Study

Steel Manufacturer Improves Blast Furnace Efficiency With Integral Orifice Flowmeter

Steel Manufacturer Improves Blast Furnace Efficiency With Integral Orifice Flowmeter

Pages 2 Pages

© 2006 Rosemount Inc. All rights reserved For more information: www.rosemount.com Steel Manufacturer Improves Blast Furnace Efficiency With Integral Orifice Flowmeter METALS & MINING ROSEMOUNT 3051SFP 3051SFP Integral Orifice Flowmeter Pipe rack skid with the “Drop-in” solution With the “drop-in” solution, Rosemount 3051SFP reduced installation time for the injection system construction. RESULTS • Reduced installation time • Minimized downtime • Improved blast furnace efficiency APPLICATION Control and billing meters from the oxygen supplier Application Characteristics: Blast Furnace Efficiency CUSTOMER Steel Manufacturer in Australia CHALLENGE The production of steel requires a lot of energy in order to transform the raw material into final product. Due to rising costs in energy pr

Join for free to read