Case Study

Steam Chest Replacement

Steam Chest Replacement

Steam Chest Replacement casestudy MTI Power was contracted to perform all machining and welding related to the replacement of a steam chest at a fossil plant in Wisconsin. All welding was performed with the orbital GTAW machine welding process. Prior to installation on site, MTI manually welded each side of the steam chest to stop valve. These two welds were 20” OD x 5.25” wt. The pipe welds on site were: Pipe Size Qty Welds 25.75” OD

Join for free to read