Case Study Stabilising and Supporting the Wellhead for Future Intervention and Continued Production Project: Signs of wear were appearing on a well in the North Sea which suggested additional support and stability for the conductor and casing strings were required to improve well integrity. Unity was asked to design and build a system that would provide support and allow the rig-up of intervention equipment without overstressing the wellhead. The solution had to allow the wellhead load to be evenly spread across the 20’’ casing spool and the 30’’ conductor, whilst also allowing for the natural growth and contraction of the well over time. Solution: • Working in close collaboration with the client, Unity designed, engineered and fabricated a Wellhead Support Clamp. • The