Case Study
St. Mary’s Janesville Hospital Benefits from Hybrid Boiler System Controlled by Cleaver-Brooks HSC
In 2011, SSM Health Care of Wisconsin built St. Mary’s Janesville Hospital in Janesville, Wis., a 50-bed community hospital that spans 175,000 sq. ft. The design of this state- of-the-art facility, engineered by Erdman Engineering, based in Madison, Wis., required the use of both high-pressure steam and hydronic boilers. After careful consideration, Cleaver-Brooks, represented by PBBS Equipment Corporation, was selected to provide the equipme