Case Study
St. Lucie Nuclear Generating Station
THE CHALLENGE To upgrade two (2) cranes to meet regulatory standards, along with increased capacity requirements necessary for dry spent fuel storage. THE SOLUTION American Crane designed, manufactured, installed, tested and provided training for the complete rebuild of these two (2) 150 ton single failure proof cask handling cranes. THE RESULT This specifi c design complied with all mandated nuclear and regu latory codes and standards includin