Case Study

Spruce Peak At Stowe

Spruce Peak At Stowe

Earth Retention Soil Nailing PROJECT CHALLENGES The General Contractor was on an expedited schedule to perform foundation work before the onset of winter. The project team also encountered a number of additional challenges at the site including high groundwater table levels and high surcharge loads on the earth retention system caused by the existing luxury homes situated up slope. www.helicaldrilling.com Spruce Peak at Stowe

Join for free to read