Case Study

Speedy visit by Amarinth to the Britannia field enables OPSAR equipment commissioning to proceed to plan

Speedy visit by Amarinth to the Britannia field enables OPSAR equipment commissioning to proceed to plan

Pages 1 Pages

A halt in commissioning Like many of the other North Sea operators, Britannia Operator Limited ordered two Amarinth B-Series API 610 pumps with Protect System 3000 series seal support systems and variable speed drives for installation on one of their rigs as part of making the rig OSPAR compliant and so reducing pollutants returned to the North Sea. The two single stage centrifugal pumps were to be commissioned by AMEC (the company su

Join for free to read