CASE STUDY SOUTHEASTERN RAIL – BROMLEY NORTH STATION EXTENSIVE GROUNDWORKS FOR BROMLEY NORTH STATION As part of our cycle parking contract with Southeastern Rail we were asked to undergo extensive groundworks for Bromley North station prior to installing cycle parking. The site was challenging with concrete and rubble in the soil and a number of large tree roots that needed removing. We also had to remove and relay a block paving area to 14m x 12m THE SOLUTION As part of the ground works we: Installed tree pits with root suppression to 3m depth CAT scanning to allow for underground services Relayed 14m x 12m of block paving Installed 18 bollards and 3 collapsiblebollards This work was carried out within the 2 week schedule and also required Lockit-Safe to re- route the passenger entrance i