Case Study
Solution for diaper manufacturer exceeded expectations with 0.5% accuracy in production
THE CHALLENGE: A diaper production facility was regularly experiencing problems with their feeder system including inaccuracy in the amount of super absorbent pellets the feeder was applying to the diapers during the manufacturing process. “Our current closed system is slow and not very precise and we need something that can apply pellets faster,” says the plant engineer. In addition, due to the inaccuracies they were experiencing, they frequ