Case Study

Sociedad Contractual Minera El Abra Overland Conveyor System

Sociedad Contractual Minera El Abra Overland Conveyor System

Pages 2 Pages

Overland Conveyor System Customer Plant Location Scope of work Sociedad Contractual Minera El Abra Open Pit Mine El Abra (Chile) Turn-key project 1 Project Figures Overland conveyor 1 stationary Length: 500 m Belt width: 1,600 mm Drive power: 4 x 450 kW Theoretical output: 5,071 m³/h 8,620 t/h Overland conveyor 2 stationary Length: 5,500 m Belt width: 1,600 mm Drive power: 5 x 900 kW Theoretical output: 5,071 m³/h 8,620 t/h

Join for free to read