Case Study
SMIT Engineering
Products Solid Edge, Femap, NX Business challenges Remove a sunken ship from the English Channel as quickly as possible to prevent damage to the environment and other ships Keys to success Ability to model ship’s structure quickly Fast design-analysis iterations permit consideration of alternate solutions Results Fast design of auxiliary structures and precise FEA calculations One of the largest wrecks ever recovered Ability