Case Study

Slurry Lines - Abrasive Dredged Material

Slurry Lines - Abrasive Dredged Material

Pages 2 Pages

The high salinity of brine and the water evaporation creates a constant build-up of salt crystals which requires to be removed. These rough crystal formations are highly abrasive and corrosive. The high temperatures of the area makes material selection more challenging. The salt slurry properties were so harsh that the dredging operators found it necessary to replace their original pipeline every three months due to wear related failures. Before turning to Pexgol, our client tried a number of alternative piping solutions without success: Pexgol lasted throughout the 1st phase of the project without experiencing any failures. The operator was able to increase his MTBF from 2,500 hours to 43,000 hours.

Join for free to read