Case Study

Slug Catcher Inspection

Slug Catcher Inspection

An overview of the “Slug Catchers“ manifold. A “Slug Catcher“ being inspected by a 48” combined inflatable ring. • 48” pipe diameter • Ring Combination (20” and 24” Inflatable Ring) • Painted pipe surface • Work at Height (Mobile Scaffolding) Job Details • Entire “Finger“ was inspected from a single location • No significant defect found within the test range Main Findings Equipment: Gas pipelines have typically used “Slug Ca

Join for free to read