Silverlake Headworks East Reservoir Trial

Silverlake Headworks East Reservoir Trial

Pages 2 Pages

Silverlake Headworks East Reservoir Trial Los Angeles, CA Project Profile (2014) Project Summary In order to protect drinking water sources and comply with EPA regulations, LADWP began construction on two 55 MG enclosed reservoirs to contain water that currently is stored in the open Silverlake and Ivanhoe reservoirs. The first reservoir (East) was completed in 2014 while the second (West) reservoir is scheduled to start construction in 2015