Case Study
Shoreham Academy - Essex
Case Study SPSenvirowall’s TS Rail System combines aesthetics with practicality at Shoreham Academy. Installers Square 1, appointed by Beard Construction, utilised SPSenvirowall’s TS Rail EPS to timber frame (SIPS) system for its development of Shoreham Academy – to provide a high quality and efficient solution for the external façade of the building. The TS Rail system was preferred for its suitability for use on lightweight framed structures of either metal or timber with the advantages of the extensive range of finishes available and accreditations that it offers. It consists of a pre-engineered insulation board that sits within a PVC rail framework which is then mechanically fixed to a sheathing board, providing drainage cavity behind the insulation system. Square 1 were able