Shipping Center Expands in North with the Upgrade

Shipping Center Expands in North with the Upgrade

CASE STUDY Shipping Center expandS in north with the Upgrade T o meet the tight schedule, Whitley Manufacturing designed the 20,000 ft 2 building with it’s UpGrade product line. The UpGrade provides a high ceiling (up to 24 ft.), a clear span structure that’s delivered to the site as one complete component. It achieves this by a patented design which allows the walls to fold under the roof section (see left photo) and delivered on a flat bed trailer. Its known for fast set-up and the ability to relocate multiple times. The project would require 41 modules to be built off-site at the Whitley factory. Most of the utilities, lighting fixtures, panels, overhead doors, man doors and insulation were installed at the factory which dramatically reduced materials and tradesman ne