Case Study
Sheridan Goldsmith Production Headers
Sheridan Production Company had purchased an existing Goldsmith field west of Odessa, Texas. The field had not been well maintained and was in dire need of retrofit. Originally, Sheridan had been rebuilding the production headers in the field using threaded pipe joining methods. However, the switch was made to Victaulic grooved technology in order to expedite the retrofit. Sheridan consulted with the Construction Piping Services group at V