Case Study

Sheraton Mirage, Queensland

Sheraton Mirage, Queensland

Pages 5 Pages

www.airmaster.com.au Energy Savings $253,944.00 per annum 16% Energy Savings Gas Savings 60% Case Study: Sheraton Mirage, Queensland2 Airmaster - CASE STUDIES www.airmaster.com.au Sheraton Mirage Location: Gold Coast, Queensland Building: Resort Complex Date Installed: October 2013 Energy Savings: $160,000.00 Gas Savings: $93,944.00 Total Energy Savings: $253,944.00 per annum Free cooling is no mirage The Sheraton Mirage Resort and Spa is an ico

Join for free to read