Shell Bonga Topsides Project

Shell Bonga Topsides Project

Oil & Gas Shell Bonga Topsides Project Tyco Fire & Integrated Solutions Business Unit: Norwich Scope of Work Supply 7 individually packaged skid mounted chemical injection systems. Tyco Fire & Integrated Solutions Client Amec Process and Energy The Project The Bonga is a giant field off-shore of Nigeria, which was discovered by Shell in 1996. The field covers 60 square kilometres and consists of multiple reservoirs in unconsolidated sands. Production is in the form of subsea manifolds to a floating production, storage and offloading vessel (FPSO). The systems included injection of the following chemicals in to the process: De-foamer Paraffin Inhibitor Pour Point Depressant Corrosion Inhibitor Demulsifier Asphaltine Inh