Case Study
Shands AGH Hospital: Sanitary Drain System Rehabilitation
Location: Gainesville, Florida Situation: 256 feet of 12” mainline sewer pipe, 160 feet of 8” pipe, 100 feet of 6” pipe and 100 feet of 4” pipe was badly corroded and needed to be rehabilitated. The drain system is mainly located under the hospital’s intensive care unit, which made a re-pipe highly undesirable. Solution: Nu Flow first cleaned the pipe system to restore full capacity, then we installed our Pull-in-Place structural liner to pr