Case Study
SET Technology Eliminates 29 days of NPT
Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2014 Enventure Global Technology Enventure and SET are trademarks of Enventure Global Technology All Rights Reserved. Ver04 06/14 PERFORMANCE SET ® Technology Eliminates 29 days of NPT Challenge Restore 13-3/8 in. casing integrity failure due to extreme drill pipe damage incurred during a sidetrack attempt (to attain regulatory approval to use wellbore) with an 11-3/4 in. High- Performance (HP) Cased-Hole Liner (CHL), which enabled reaching TD by adding an additional casing string (9-5/8 in. Openhole Liner (OHL)) to address a depleted area that stopped prior sidetrack attempts from reaching the deep, exploratory target.