Case Study

Series compensated 500 kV power transmission corridor in Argentina

Series compensated 500 kV power transmission corridor in Argentina

Pages 4 Pages

Series compensated 500 kV power transmission corridor in Argentina FACTS With the 4th line in operation, the overall power transmission capacity of the system has been increased by 1300 MW, to a total of 4600 MW. Together with the series capacitors for the 4th line, a number of 500 kV shunt reactors, altogether rated at over 700 Mvar, were supplied by ABB. Also part of the undertaking was relay protection of the line, line communication eq

Join for free to read