Case Study
Second Solar Park At Cambridgeshire Site
Location Chittering, Cambridgeshire Size 6.3 MWp Annual generation 5,700 MWh CO 2 savings per year 3,240 tonnes Estimations only, correct at time of installation Case study Second solar park at Cambridgeshire site The starting-point Abbey Renewables wanted to develop a 6.5MW solar farm alongside the 5MW installation initially developed at this same site in 2012. The funding partner was Lightsource Renewables, and the chosen EPC contractor wa