Case Study
Seattle USA- LED FLOOD LIGHTING
CASE STUDY Seattle USA LED FLOOD LIGHTING SPORTS LIGHTING Seattle Mariners Safeco FieldProject Benefits Summary Introducing the first LED lighting system to be used in Major League Baseball after 2 years of careful inspections and prepa- rations a midst tough competition among well-known lighting companies from around the world. GigaTera’s product proved to be ahead-of-the-curve in terms of performance and succeeded in winning the contract for the project. The introduction of a LED and lighting system not only ena- bles energy savings and an enhancement to the eco-friendly image fo the team but also is expected to contribute to the improved athletic performance of the players. Each existing 2.0kW (2.13kW_ including ballast loss) metal hal- ide lamp was benched for a SUF A 800W produ