Case Study

Seamless electroplating at Collini.

Seamless electroplating at Collini.

Pages 2 Pages

primary products I collini direct connection of erp to scada? Protec was given a long list of requirements: It started with the design and engineering of all the site electrical equipment and the zenon supervisory process control visualization for operat- ing the system. Production data was to be transferred directly from a SAP application at the ERP level to the SCADA system. As an additional process data acquisition task, all productio

Join for free to read