Case Study
Scottish Power Limited
In line with the Government’s regulations for large combustion plants (i.e. the Large Combustion Plant Directive), Scottish Power decided to fit Flue Gas Desulphurisation (FGD) plant to three of the four units, and in doing so secured the future of power generation at Longannet. The EPC contractor appointed to build the FGD plant was an alliance of Alstom Power and AMEC. This alliance was responsible for the design, construction and commiss