Case Study
Schlitt Seawall Dike
PROJECT LOCATION: Vero Beach, Florida PROJECT SCOPE The Presto Geoweb® vegetated Earth Retention System, installed adjacent to a saltwater estuary, provided a stable, aesthetically-pleasing seawall for a Florida developer. The soil surrounding the estuary contained high moisture con- tent and low shear strength. A retention structure was required to hold back the weak soils and support the sur- charge loads imposed by a planned office