Scale Model Testing Of Grouted Pile-Sleeve Connection Of HI Platform, HRP Project, Mumbai High, India
Scale Model Testing Of Grouted Pile-Sleeve Connection Of HI Platform, HRP Project, Mumbai High, India
Scale Model Testing of Grouted Pile-Sleeve Connection of HI Platform, HRP Project, Mumbai High, India CASE HISTORY The design pile penetration was 125 m below the mudline for Piles A1 and B1, and 122 m for Piles A2 and B2. The actual pile penetrations of Pile A1, A2 and B2 when driving refusal was encountered, were 86 m, 88 m and 87.5 m respectively. Conse- quently, the upper portions of these piles, including the pa