Scale Model Testing of Grouted Pile-Sleeve Connection of HI Platform,   HRP Project, Mumbai High, India  CASE HISTORY The design pile penetration was  125  m  below  the  mudline  for  Piles A1 and B1, and 122 m for  Piles A2 and B2. The actual pile  penetrations of Pile A1, A2 and  B2  when  driving  refusal  was  encountered, were 86 m, 88 m  and 87.5 m respectively. Conse- quently,  the  upper  portions  of  these  piles,  including  the  pa