Case Study

Saving the Day at USC KKG House

Saving the Day at USC KKG House

Saving the Day at USC KKG House Project Name Project Location Completion Date The Team Owner HVAC Contractor HVAC Distributor HVAC Design Consultant case study September 2010 in the system), the flood was massive, affecting both the first floor and basement. Five Cooling and Heating Systems In April 2006, bids from the executive committee went out to local HVAC contractors to replace the building’ s antiquated system with new cooling and

Join for free to read