Case Study
Saving tanks
A client was preparing to build a new large chemical facility. The process uses several batch reactors to create the crude product and then switches to continuous operation for the rest of the process. The reactors used pressurised water at high temperature as a sol- vent, but it was important to cool the contents to bring the pressure below atmospheric before discharging the batch. This required a high flow rate of water that was supplied from a