Case Study

Sarah Mildred Long bridge replacement

Sarah Mildred Long bridge replacement

Pages 1 Pages

In 2011, MaineDOT engaged Kleinfelder to provide strategic direction and undertake Section 106 and Section 4(f) compliance for its Sarah Mildred Long Bridge project. The National Register-eligible bridge, built in 1940, spans between Kittery, Maine, and Portsmouth, New Hampshire. The area is home to National Historic Landmarks, National Register-listed sites, and several National Register-eligible sites and historic districts. significant lev

Join for free to read