Case Study

Santa Barbara Middle School

Santa Barbara Middle School

Pages 1 Pages

Project Name Santa Barbara Middle School Installer Mike Pigeon Contractor The Floor Connection, Inc. Architect Western Architectural – Portland, Oregon Featured Products ARDEX LU 100™ Self-Leveling Flooring Underlayment (384 bags) Challenge: • 3-inch (7.5 cm) deep fill application • Quick turnaround for two new classrooms • School is in session with work area fenced off Problem /Situation: Uneven slabs to be brought within flooring tol

Join for free to read