Case Study
Sanjel’s Coiled Tubing saves $91,000 CAD in Post Stimulation Workover
istory Background The SUREstack multistage isolation system was implemented for an operator in the Drumheller area to address their multizone fracturing needs. Together, Sanjel Coiled Tubing services and Suretech Completions provided the customer with a complete solution: a post fracturing seat retrieval with no need for milling or drilling balls to create full wellbore post stimulation access for production operations. Case Study I