Case Study
Sanjel Successfully Executes a 4,572 m (15,000 ft) Horizontal Liner Cement Job for a Bakken Completion
Sanjel Successfully Executes a 4,572 m (15,000 ft) Horizontal Liner Cement Job for a Bakken Completion
Case History Cementing – A Sanjel Specialized Energy Service sanjel.com Sanjel Successfully Executes a 4,572 m (15,000 ft) Horizontal Liner Cement Job for a Bakken Completion Features & Benefits n Sanjel’s proprietary cement blend, SanTail, was engineered specifically for cementing horizontal liners in the Williston Basin n An optimized slurry for slim hole conditions with low fluid loss and low viscosity effectively reduced friction