Case Study
Sanitary sewer overflow (SSO) treatment facility
The SRVSA discovered a significant sanitary sewer overflow (SSO) within the conveyance system, resulting in the closure of a public park. Kleinfelder is designing, permitting, and managing construction of a SSO treatment facility to solve this significant public health problem. technical and regulatory challenges During extreme wet-weather conditions when the SRVSA’s interceptor reaches its conveyance capacity, raw wastewater is escaping fro