Case Study

Samsoe Offshore Wind Farm

Samsoe Offshore Wind Farm

Pages 1 Pages

In October year 2002 installation of the 10 turbines / 23 MW offshore wind farm was started south of the Danish island Samsoe in Kattegat. ITW Densit was appointed as grouting contractor to establish connection between the driven monopile and the wind turbine. Foundation of Samsoe Offshore Wind Farm - Ducorit ® D4 • Fast strength development • Smooth and safe offshore grouting operation • Outstanding fatigue strength proven through scal

Join for free to read