Case Study

Salt Lake & Sandy, UT - Water Treatment Plant

Salt Lake & Sandy, UT - Water Treatment Plant

Point of the Mountain Water Treatment Plant Carollo led the effort to conduct a pilot study for Metropolitan Water District of Salt Lake and Sandy. The study evaluated several potential treatment trains for a new 70-mgd Point of the Mountain Water Treatment Plant. Three potential treatment trains for the 70-mgd Point of the Mountain Water Treatment Plant were evaluated as follows: • Treatment Train No. 1 – low pressure membrane filtration with co

Join for free to read