Case Study
Salt Court Townhomes
Salt Court Townhomes • Redwood City, CA • Spring 2010 • Geofoam Landscape Fill • 52,300 Cubic Feet Engineer John Gouchon BKF Engineers General Engineering Contractor Phase 1: Top Grade Construction Phase 2: DeSilva Gates Salt Court Townhomes Geof oam Application 52,300 cubic feet of EPS 19 Geofoam was used as landscape fill in the construction of the new Salt Court Townhomes at The Preserve community in Redwood