the River Restoration Centre Case Study Series This site was last visited by RRC staff on 15 th June 2003 Tel/fax: 01234 752979 Email: rrc@therrc.co.uk http://www.therrc.co.uk An interpretation Board alongside the River Avon, Salisbury city centre. View of enhanced concrete flood walls, August 2001. Salisbury City Centre Millennium Project Technique: Enhancing concrete floodwalls Project location: Salisbury River: Avon County: Wiltshire Project start date: June 2000 Project end date: June 2000 Length: 0.12km Cost: £29,000 Upstream grid reference: SU 143 303 Site background The River Avon Special Area of Conservation & SSSI runs through the heart of Salisbury City Centre.