Saipem 7000
Consultancy for marine operations Case study: Saipem 7000 “The Claymore operation was completed in a very tight operational window. The project has benefited from this forecast technology and service.” Peter Lai Technology Manager, Saipem Challenge The Saipem 7000 (S7000), a large semi-submersible crane vessel, required a 12 hour window to install an air compressor on the Claymore oil platform in the North Sea. While the S7000 was out at