Case Study
S&C Provides Expedited Delivery of a 90-mW Wind Plant
CASE STUDY POWER SYSTEMS SERVICES October 29, 2012© www.sandc.com/services 180-1056 customer challenge A major wind developer needed to design, construct, and begin operating a 90-MW, 50-turbine wind plant in the short timeframe of approximately 12 months. They required engineering, procurement, and construction services for the collector system, collector substation, and interconnection transmission line. The developer faced two major dead