Case Study

Rwe Energie Opts For Simona® Pp-H 100 Alphaplus

Rwe Energie Opts For Simona® Pp-H 100 Alphaplus

Pages 2 Pages

The project at a glance Project Replacement of the flue-gas desulphu- risation system at the Niederaußem power plant with nozzle lances made of SIMONA ® PP-H 100 AlphaPlus ® Requirements ? External and internal chemical and abrasive stress ? Media: HCl, SO 2 , HF, washing fluid gypsum suspension, pH value 3–4 ? Total solids: approx. 12 to 15 %, Operating pressure: approx. 0.5 bar ? Operating temperature: approx. 70 °C Client RWE Energ

Join for free to read