City Ruskin, BC Country Canada Client BC Hydro Contract type Bid-Build Construction period June 2012-September 2017 HOCHTIEF Group Company Flatiron is upgrading the Ruskin Dam and Powerhouse, which is 60 kilometers (37 miles) east of Vancouver on the Stave River in Canada. The dam, built in the 1930s, provides power to homes and businesses across British Columbia. Flatiron is now working on two separate contracts on the dam. The first, started in June 2012, includes seismically upgrading the dam and the powerhouse by constructing new piers, installing new spillway gates, constructing a two-lane bridge and powerhouse superstructure upgrade, and installing a new powerhouse crane and elevator. The second includes refurbishing the dam’s three generating units. Crews are conducting repairs and