Case Study

Runcorn UID's -ICI Saltworks Pumping Station & Combined Sewer Overflow Scottish Water

Runcorn UID's -ICI Saltworks Pumping Station & Combined Sewer Overflow Scottish Water

Pages 1 Pages

RUNCORN UID'S - ICI SALTWORKS PUMPING STATION & COMBINED SEWER OVERFLOW 5500m of 1500 & 1800mm diameter tunnel sewer through coal measure rocks, glacial drift and alluvial deposits to allow the closure of 2 No. WwTW's, and to divert the flows into the new Kelvin Valley Sewerage System. Three of our closed face tunnelling systems were used for the drives, two Herrenknecht AVN 1500'T's and an AVN 1800'D' slurry systems, as well as our open-f

Join for free to read