Case Study

RPP® Panther®

RPP® Panther®

Case Study INDUSTRY APPLICATION PROBLEM SOLUTION Stock Feed Plant BENEFIT Premature failure of the roller chain drive on the auger was causing ongoing downtime losses every 4 months. Time was also being lost in having to lubricate the chain drive. This was not a regular program and the inevitable failure of the drive caused loss of

Join for free to read