Case Study
RPP® Panther®
Case Study INDUSTRY APPLICATION PROBLEM SOLUTION Stock Feed Plant BENEFIT Premature failure of the roller chain drive on the auger was causing ongoing downtime losses every 4 months. Time was also being lost in having to lubricate the chain drive. This was not a regular program and the inevitable failure of the drive caused loss of