Case Study

ROYAL WILLIAM YARD, PLYMOUTH

ROYAL WILLIAM YARD, PLYMOUTH

Pages 1 Pages

ROYAL WILLIAM YARD, PLYMOUTH Developer and Main Contractor: Urban Splash Architects: Acanthus Ferguson Mann Products installed: C40 & CK30 acoustic floor systems AC90/2FP acoustic ceiling system Isolating strip Constructed between 1825 and 1833, the Clarence and Brewhouse buildings are part of the Grade I listed Royal William Yard, the main storage and victualling complex of the Royal Navy for over 150 years. Comprising seven buildings in total, the conversion of the first two won a RIBA Award in 2006. In the three storey Clarence building isolation strip was fixed to the top of floor joists before the hardwood floor was laid in order to meet required sound insulation levels. In 2006 the larger three to six storey Brewhouse was com

Join for free to read