Case Study

Road Widening & Reconstruction Athlone to Hilton, N3, Section 3

Road Widening & Reconstruction Athlone to Hilton, N3, Section 3

JOHANNESBURG (011) 8798400 PINETOWN (031) 7172300 CAPE TOWN (021) 5318110 Road Widening & Reconstruction Athlone to Hilton, N3, Section 3 GEOSYNTHETICS Ref No: DRAINAGE 0043-03/04 Case Study bidim is a registered trade mark Project: Athlone to Hilton, N3, Section 3 Client: S A N R A Ltd Date: June 2002 Consultant: Ingerop Africa, Letsunyane & Ass, Preben Naidoo (joint venture) Quantity: 500 m 10 000 m² Contractor: Basil Read / Milling T

Join for free to read