Case Study

Riviera Mall - Moscow, Russia

Riviera Mall - Moscow, Russia

© 5+design RE1894en / 9127185 / 02-19 / 1.000 Riviera Mall Moscow, Russia Project Z Shopping Center Z Customer: Renaissance Construction Task Z The large Riviera Mall was new built in 2015 and required a reliable pressurization system. Because of the non-standard heating capacity and the static height of the system, a dynamic pressure-maintaining system of high quality was needed. Product solution Z Reflex Variomat control module VS 2-2/60 Z Reflex Variomat vessels VF 1500, VG 1500, VG 1500 Z 2 x Reflex expansion vessels G 1000/6 Achieved goals Z The pressurization unit is working reliable since its installation in 2015. Z Besides ensuring the pressure maintenance, degassing and automatic water-make up are part of the Variomat’s service scope. The system water is therefore

Join for free to read